Skip to main content
Home
Contact

Revamp of 20-Year-Old Loadport

30% Cost Reduction, Technology Upgrade & Product Sustenance

Download Case Study
Revamp of 20-Year-Old  Loadport

Our team redesigned a 20-year-old load port using modern technology and made it cost-competitive. This solution aided in the following areas:

  • a wafer environment that is always clean
  • cassette transfer using Isolation Technology (SMIF interface while cassette transfer)
  • redesigning and changing component sources reduced costs by 30%.
  • adjustable floor mount base for simple installation
  • modern design that complies with semi-standards
Download Case Study

By clicking Submit, you agree to the Privacy Policy

By clicking Submit, you agree to the Privacy Policy

LTTS
  •  Twitter
  •  LinkedIn
  •  YouTube
  •  Facebook
  •  Instagram
  • Copyright & Terms
  • Privacy
  • Sitemap
  • info@ltts.com

© 2025 L&T Technology Services Limited. All Rights Reserved.