Skip to main content
Home
Contact

100% on-time shipment of products

Download Case Study
Switchgear
Engineering support in LV/MV switchgear

The client, a global technology leader in power distribution, power quality, industrial automation and power control products, required to generate a large volume of electrical shop drawings in a very short time. They were seeking a partner for engineering support who would not negatively impact quality and schedule.

They entrusted us with providing engineering support in LV/MV switchgear, and we, in turn, ensured 100% on-time shipment of products.

Benefits delivered:
  • 100% on-time shipment of products
  • Delivering a cost- and time-effective solution
  • Improved productivity
  • Providing skilled and experienced resources at optimum cost
  • Providing time zone advantage and flexibility to scale operations

 

Download and read our case study to know more about this success story.

Download Case Study

By clicking Submit, you agree to the Privacy Policy

By clicking Submit, you agree to the Privacy Policy

LTTS
  •  Twitter
  •  LinkedIn
  •  YouTube
  •  Facebook
  •  Instagram
  • Copyright & Terms
  • Privacy
  • Sitemap
  • info@ltts.com

© 2025 L&T Technology Services Limited. All Rights Reserved.