A global power tools manufacturer needed 386 product requirements turned into validated embedded test scripts. At their own measured rate, that was 193 man-days of specialist effort, with no in-house AI capability to shorten it.
Read how it was delivered in 10 man-days, and why building the reviewer agent mattered more than building the generator.