Build one of Europe's largest greenfield refineries — on some of its weakest ground. That was the brief handed to LTTS by a global edible oil major: deliver a strategic European foothold, at scale, end-to-end — with the project's single biggest risk sitting quite literally beneath it. Add a live European supply-chain squeeze, a sprawling site, and an unforgiving execution window, and the margin for error all but disappeared. So how do you engineer certainty when the ground itself is against you? LTTS owned the full EPCM scope from FEED to field, engineering the biggest risks out before they ever reached construction — and turning demanding soil into a strategic advantage.
Download the case study to see how LTTS engineers scale on the toughest ground.