Skip to main content
Home
Contact

Automatic Train Control (ATC) and Interlocking

For Reliable Train Operations

Download Case Study
Automatic Train Control (ATC) and Interlocking for Reliable Train Operations
Automatic Train Control (ATC) and Interlocking for Reliable Train Operations

A Leading Japanese Rail Manufacturing Company was looking for a partner with previous excellence in building application logic for Automatic Train Control System.

 

Download the case study to know more about 

  • Benefits client achieved by patterning with L&T Technology Services  
  • Solution highlights on creating the application data for the ATC and interlocking
  • How “First Time Right (FTR)“ was achieved
Download Case Study

By clicking Submit, you agree to the Privacy Policy

By clicking Submit, you agree to the Privacy Policy

LTTS
  •  Twitter
  •  LinkedIn
  •  YouTube
  •  Facebook
  •  Instagram
  • Copyright & Terms
  • Privacy
  • Sitemap
  • info@ltts.com

© 2025 L&T Technology Services Limited. All Rights Reserved.